Wangaratta Solar Farm
Providing energy that is
Renewable
Reliable &
Affordable
Located in North Wangaratta, the 38 MWdc Wangaratta solar farm designed and built by CleanPeak Energy has been operating since the end of 2025. This utility scale in-front-of-the-meter solar asset comprises approximately 71,000 solar panels, fully automated to track the daily east-west movement of the sun , optimising renewable generation capability.
The Wangaratta Solar Farm is connected to the surrounding distribution network, capable of supplying approximately 72,000 MWh of clean energy annually to the nearby Glenrowan substation. That’s enough clean energy to avoid close to 60,000 tonnes of CO2 being emitted into the atmosphere every year.
The project already includes a 20 MWh battery energy storage system (BESS), with plans for additional storage capacity to be developed, enhancing grid stability and supporting the integration of the renewable energy source.
Project Highlights
Benefits
For Wangaratta
CleanPeak works with local subcontractors and suppliers wherever possible, and have set up a Community Benefits Fund to support local projects, events, and initiatives in Wangaratta across the life of the solar farm.
For the Climate
Once fully operational, the Wangaratta Solar Farm is expected to offset close to 60,000 tonnes of carbon emissions each year, equivalent to taking more than 12,000 fuel-burning cars off the road.
For the Land
The site has been carefully placed to protect environmental values, minimise native vegetation removal and respect areas of cultural sensitivity, with our Net Positive Biodiversity Action Plan, guiding how the land is enhanced over time.
The Wangaratta Solar Farm is located on the corner of Bowser Rd and Coleman Rd in North Wangaratta, Victoria.
The site comprises two electrically separate solar farms; in-front-of-the-meter Wangaratta North Solar Farm, and adjacent, behind-the-meter Alpine Solar Farm (shown in gold).
The site is well positioned to deliver renewable energy into the electricity network via the Glenrowan substation, while being carefully designed to protect native vegetation and respect areas of cultural sensitivity.
Location
Project Lifecycle
Progress
CleanPeak Energy is a specialist renewable energy company. We build, own and operate a portfolio of solar, battery and thermal energy infrastructure – providing smart, reliable and cost-effective energy to our customers.
Our tailored solutions make us the trusted partner of major Australian corporations and governments seeking to become more sustainable, reduce their carbon emissions and transition to net-zero. Since our inception in 2017, we have rapidly grown to be a major force in the development and operation of distributed energy and utility infrastructure.
About Us
Get in touch.
Head Office: Level 21, 201 Miller St, North Sydney, NSW 2060
CleanPeak Energy acknowledges the traditional owners of the lands on which we operate and pay our respects to Elders past and present. We recognise the continuing connection of the Bpangerang People to Country and their stewardship over the land on which our Wangaratta Solar Farm is being built, and its waterways, for thousands of years.